JAS
geomatics .in
Mapping with Zero Interruption: How to Map a Busy CBD Tower Without Downtime
Customer Stories

Mapping with Zero Interruption: How to Map a Busy CBD Tower Without Downtime

Nov 13, 2025Surveying 4 min read

A facilities team in BKC, Mumbai maps an occupied 32-floor tower during working hours — no shutdowns, no night shifts.

Client
Facilities management firm, Mumbai
Kit
FJD Trion P1
Scope
32 occupied floors, BKC
Result
Full tower mapped in 3 working days

The constraint

Daytime mapping in busy buildings used to be a logistical headache — tripods in corridors, cordons, and tenant complaints. Most teams pushed the work to nights and weekends at premium cost.

The workflow

  • One operator walks each floor loop in 6–9 minutes with a handheld scanner.
  • Moving people filtered out during processing.
  • Floors registered into a single vertical model using stair links.

Outcome

  • Whole tower captured in three normal working days.
  • No tenant disruption and no overtime premium.
  • Floor plans and asset positions delivered to the CAFM system.

More in Customer Stories